Highway

  • 3,0 km guideline conforming highway simulation
  • Steep curve for increased entry speeds
  • 3 lanes with 90 m width
  • Entry, exit and intertwining areas
  • Traffic light system for traffic management

Test Areas

  • Varyingly sized, combinable areas up to 
    550 x 50 m
  • Optimized asphalt for testing of NCAP Tools
  • Roadmarking and road edges
  • Intersections for crossing traffic
  • Secured areas for autonomous driving systems

Handling Track

  • 1,6 to 5,5 km handling track
  • Stable friction coefficient
  • RAL conforming roadmarking for normal road simulation
  • Traffic lights and security cameras
  • Direct connection onto the 20 % steep curve leading to the highway simulation

Wet Handling Track

  • 1,8 km irrigated handling track
  • 6,5 m width
  • Integrated skidpad with a 50 m radius
  • Perfectly even asphalt with constant friction coefficients
  • Optimal water quality and temperature

Lateral Aquaplaning

  • R 100m circular run in
  • Variable water film depth up to 18 mm in 20 x 5 m
  • Additional 20 m wet area before the flood area
  • Generous safety area

Braking Tracks

  • Asphalt and concrete dry braking tracks
  • Two ECE-R117 asphalt wet braking tracks
  • Concrete wet braking track
  • 8 m wide tiled track with high friction coefficients (µ-Split)
  • Basin for longitudinal aquaplaning